
i
INSTALLATION OVERVIEW
NOTE: BEFORE YOU INSTALL
SITE SELECTION
wall.
Review and consider all of the following condi-
r r wo (2) wall
ethods:
t-In (page 17)
W nt (Page 22)
re the power cord is so
pinched or againstasharp edge
and
power cord is stored
or
red to avoid tripping or snagging
ry to persons.
st c with local codes
-
ry to persons.
rapes, pillow -
re etc.
dir ht and away fr overhead light-
ing.
electric et for ease of electric
and all hardware fr ox and r ove all
packaging relat aterials prior to installa-
WARNING:
T
Phillip rewdriver
aw and/ aw
Level
Tape
Pliers
re
Gloves
13
E
Fr aterials
Wall Finishing Mar-
terials
aterials
stable)
TOOLS & BUILDING SUPPLIES
NORMALLY REQUIRED
Volt cir r red.
cated cir referr -
Power supply Wire Gage
Voltage Wire Gage Fuse
120 v 14 G . 15 MP
Wall switch / t hermostat Wire Gage
Voltage Wire Gage
5 Volts 18 Gage
PACKAGING LIST
with:
r te control
To reduce the risk of fire, do not store or
use gasoline or other flammable vapors
and liquids in the vicinity of the heater.
not installed
that it is
ensure that the
Decorative media (See page 23)
Comentários a estes Manuais